Tesco Project

Tesco

Tesco required a clear definition of the maximum capacity of its chill cross dock centres. This needed to be combined with the corresponding operating processes and procedures to ensure this capacity could be delivered.

We conducted a detailed operational review that mapped out the timing and phasing of key activities, and corresponding utilisations of equipment, space and labour. We identified opportunities to reduce dwell time, process cycle time or both. 

The study defined both the maximum depot capacity (+25% on current) and the operational blueprints for the DC to deliver this capacity. These were subsequently rolled out across the network.


← Return to Client Portfolio

 
supply chain consultants

The Tesco team turned to Total Logistics when they needed to get increased throughput in a chilled DC already over its design capacity.

 

 

Downloads Centre

Click here to discover Total Logistics case studies, white papers, videos and top tips for supply chain cost reduction.

 

Sign up for our e•newsletter

Our in-house newsletter provides useful information on current logistics and supply chain issues and company news.

Sign up for our e-newsletterFollow Total Logistics on Twitter

© Copyright 2006 - 2012 Reg. Office. Reg. in England and Wales | Co. Reg. No. 7189187 | VAT Reg. No. 537 552 236.  |  Privacy  |  Terms & Conditions  |  Sitemap  |  Search Engine Optimisation Kent  |  Online CMS